MOCK DATA 方案验证界面,不连接商业 EDA 工具,不代表真实 signoff 结果 STATIC FIXTURE / 2026-07-23
PORTAL RELEASE LOCAL 0.0.0-local unpublished MOCK PROJECT local-dashboard unpublished
01 EDA
MISSION CONTROL
PROGRAMAUTONOMOUS EDA
MISSIONM-024
DESIGN SPECDS-024 / V0.7
DATA SOURCESTATIC FIXTURE
CD OPERATOR
CURRENT MISSION / MOCK-DEMO-01 / SYNTHETIC PROFILE: MOCK

Close the control-path timing gap without violating the locked latency contract.

综合后 setup 收敛任务。当前候选增加一级 pipeline,但会触碰 DesignSpec 的最大响应延迟要求,因此执行前需要人工裁决。

MISSION STATE BLOCKED / HUMAN DECISION Stage 4B · Proposal CS-017 · locked DesignSpec conflict
MISSION STATEBLOCKED
GATE OUTCOMEGATE-4B-MOCK-006 / FAIL
GATE VALIDITYCURRENT
EXECUTION AUTH STATEAWAITING_PAYLOAD_APPROVAL
DESIGN SPECLOCKED / BINDING
DATA SOURCESTATIC_FIXTURE
OPERATORCORY / DESIGN
RECOVERYCP-006 / FIXTURE
OWNER
CORY / DESIGN
ACTIVE ROLE
REVIEWER
FIXTURE TIME
01:42:18
RECOVERY
CP-006 / FIXTURE
ATTEMPT
06 / 12 MAX
BUDGET
64% REMAINING

NEXT SAFE ACTIONREQUEST CHANGES / KEEP ≤2 CYCLES

Mission Control orbit status

MISSION OBSERVATORYFOUR AXES / ONE DECISIONSTATIC FIXTURE / NO EDA EXECUTION
MISSION / M-024 BLOCKED GATE-4B-MOCK-006 / FAIL LOCKED LATENCY CONTRACT
01 / AUTHORITY2B / APPROVALHUMAN GATE
02 / DESIGNSPECDS-024 / LOCKED2 CYCLES MAX
03 / EVIDENCEEB-4B-00611 OBJECTS
04 / EXECUTIONAWAITING REVIEWNO ENVELOPE
NEXT SAFE ACTION REQUEST A LATENCY-PRESERVING REPLACEMENT ARQ-044 / PENDING HUMAN DECISION
ACTIVE GATELOCKED ROUTEFROZEN EVIDENCE
PROPOSAL / CS-017 / ACCEPTED_FOR_RESOLUTION

Pipeline insertion requires a contract decision

RISK / HIGH

Agent proposal

Insert one register stage on the response path to recover 82 ps of setup margin. The change is structurally valid but increases worst-case response latency from 2 to 3 cycles.

PROPOSAL HASH sha256:35af313b033d…837717
WNS
-0.082ns now+0.094 expected
LATENCY
2cycles locked3 proposed
AREA
18,430µm² now+0.7% expected
POWER
8.7mW now+0.3 mW expected
BLOCKING FINDING REQ-LAT-004 permits no more than 2 response cycles.

Reviewer found a direct conflict between the candidate microarchitecture and locked DesignSpec DS-024/V0.7.

SAFE RECOVERY CP-006 static fixture remains available and downstream stage fixtures stay locked.

Rejecting or requesting a revision leaves the current simulated lineage unchanged.

EVIDENCE HORIZON / FOUR ORBITAL AXES

Qualification, EDA depth and authority stay separate

EXECUTION DETAIL ↗
CONTROL MAPFOUR INDEPENDENT AXESSTATIC FIXTURE · NO EDA EXECUTION
AUTHORITY MATURITY / CURRENT MOCK_RTL CAPABILITY
  1. 1READ ONLYSIMULATED
  2. 2APROPOSESIMULATED
  3. 2BAPPROVAL GATEPAYLOAD REVIEW
  4. 3BOUNDED AUTOLOCKED
QUALIFICATION BASELINE
  1. 0ASCOPE SCHEMASIMULATED
  2. 0BTOOL PROFILEUNQUALIFIED
  3. 0CGOLDEN BASELINESIMULATED
EDA DOMAIN DEPTH
  1. 3ARTL STATICSIMULATED
  2. 3BVERIFYSIMULATED
  3. 4ASYNTHSIMULATED
  4. 4BSTAGATE FAIL
  5. 5AFLOORPLANLOCKED
  6. 5BPLACE / CTSLOCKED
  7. 5CROUTELOCKED
  8. 5DBOUNDED ECOLOCKED
  9. 6ASIGNOFFLOCKED
  10. 6BRELEASEHUMAN LOCK
OFFLINE MODEL LIFECYCLE
  1. 7ATRACE CURATIONOFFLINE
  2. 7BMODEL GOVERNANCEOFFLINE

Mission evidence, plan and attempt workspace

QOR / COMPARABLE

Candidate trajectory

WNS TARGET
WNS across six attempts and one pending proposal WNS improved from minus 0.31 nanoseconds to minus 0.082 nanoseconds across six attempts. The pending proposal is estimated to reach plus 0.012 nanoseconds but has not run. +0.05-0.10-0.20-0.30 A1A2A3A4A5A6P
CURRENT FIXTURE-0.082 nsAttempt A-006
BEST FIXTURE-0.082 nsRecovery CP-006
TARGET≥ 0.000 nsBlocker GC-STA-SETUP-01
DECISION LEDGERSTATIC FIXTURE
  1. REVIEWER

    Raised blocking conflict against REQ-LAT-004.

    F-031
  2. CONTROL

    Rejected automatic execution and requested exact-hash approval.

    EV-219
  3. PRODUCER

    Submitted CS-017 against RTL snapshot git:19c4a7.

    CS-017
  4. GATE

    STA setup failed with WNS -0.082 ns. Evidence is complete.

    G-4B-18